A14 Kettering Bypass J7-9
LOCATION: A14, Kettering, Bypass J7-9, Northamptonshire, NN15 6FZ
CLIENT: Highways England
ECOCRIB SYSTEM: Reinforced Soil
FACE AREA: 1800m²
MAXIMUM RATINED HEIGHT: 4.5m
PLASTIC WASTE DIVERTED FROM LANDFILL: 160 Tonnes
Click here to download the full case study
This is perhaps our most prestigous project, having sought technical approval from the highways division which was straight forward due to PC construction having a BBA certificate for Ecocrib. The BBA details technical specification which can solve most questions when judging if a system is suitable for your retaining wall needs.