Norwest Holst, Birmingham
PC Construction's contract works included supply, design and construction of the gabion retaining wall and the placement of backfill. This gabion wall has been designed and constructed to retain the site boundary along the length of a new access road to a new industrial development. The gabions were filled with crushed concrete and faced with 6g stone.
- Face Area: 410m³
- Height: 3m
- Construction time: 2 weeks